THE STANDARD... BY WHICH OTHERS COMPARE Home Add To Favorites Contacts Version française


Call Us Now: (800) 663-1256

Some descriptive text

247
PEDESTAL - INSTALLATION INSTRUCTIONS
Model 7400 - Pedestal boxes may be bolted to a
concrete pad by 2 methods - lag bolts or wedge anchors.
 
1. Lag Bolts
    - Place mailbox module in position and mark
      hole locations on concrete pad.
    - Remove module
    - Drill 4 - 5/8" holes into concrete pad
    - Drill 2 - 1/2" down for 2 - 1/4" lead anchor
      shields - tap flush to surface of concrete
    - Re-position mailbox module so that holes in
      baseplate align with holes in pad
    - Use 3/8" lag bolts - 2" long with plate washers.
      Ratchet bolts securely - do not over turn bolts
      as they may snap.
2. Wedge Anchors
      Wedge anchors may also be used and offer
      the advantage of placing the mailbox on
      location only once.
    - Place box in final position
    - Drill 3/8" pilot holes 3" deep -down through
      the holes in the pedestal baseplate
    - Insert wedge anchors into holes and tap
      down into hole using hammer
    - Ratchet wedge anchors securely to
      concrete pad.

Required Tools
1/2" hammer drill
Ratchet or heavy duty pliers or
open box wrench hammer

For Option 1 - Lag Bolts:
5/8" masonry drill bit
4 - 3/8" x 2" lag bolts
4 - 5/8" x 2 1/4" lead anchors

For Option 2 - Wedge Anchors:
3/8" masonry bit
4 -3/8" x 2-3/4" wedge anchors